Help CenterKnowledge BaseTaskMapper Plans

TaskMapper Plans

Last updated October 9, 2024

TABLE OF CONTENTS

Introduction To TaskMapper Plans

Manage drawings and collaborate with onsite teams in real-time

View, edit, annotate, and upload drawings from anywhere with version control. Attach tasks, forms, images, and more. Give crews the drawings they need to get the job done.

Figure 1: Plan View

Update and manage plans from anywhere

View or edit your site, floor, architectural, structural, and more plans from anywhere. Upload the revised files to a central repository with version control to ensure everyone works with the latest version.

Figure 2: Central repository for all your drawings

Give your crew drawings to get the work done

Notify your crew of drawing updates so they can access the latest versions to get the job done. Enhance collaboration with annotations, measurements, and comments in real time. View any tasks added to the plan view on the map view.

Figure 3: Enhance collaboration with inbuilt tools

Manage work, from design to execution, from one screen

Access, edit, annotate, and upload your plans from anywhere and ensure accurate as-built records with the capture of photos and videos attached to features on the plan or map.

Figure 4: Collaboration and activity management in plans using tasks

Plans FAQ

What are Drawings and Plans?

Drawings are a digital container or directory that is used to organize plans. It helps keep related plans together and makes locating and accessing them easier.

Figure 5: Drawings and plans

How to upload plans?

1) Click on 'Plans' in the asset view

Figure 6: Plans feature

2) Click on 'New Drawing' to organise documents by folders and click 'Upload Plan' to upload the drawings.

Figure 7: Drawings to organize plans

3) The plan gets uploaded. Then, 

  • Use the blue highlighter to choose the sheet number on the first sheet.
  • Similarly, use the pink highlighter to select the sheet description once.
  • Click on 'Next'.
  • The sheet number and description will be extracted and updated for all the sheets.
TaskMapper Plans

Figure 8: Capture sheet number and sheet description

Review sheet number and description. Edit if required and hit enter to save.

Figure 9: Uploaded plans view

4) The uploaded files will default to the 'Unassigned' folder. Select the plans to organize them by drawings, and click 'Actions'.

Figure 10: Organize plans

5) From the drop-down, choose 'Assign'.

Select a drawing or create a new one by clicking on 'New drawing'. Then click on 'Assign' and 'Save' the changes.

Figure 11(a): Create new drawings

Figure 11(b): Assign plans to drawings

The files are in the assigned folder. Repeat the process to organise all the unassigned files. 

How to upload new versions?

Method1: Automated versioning

The Plans feature is designed to automatically detect the latest versions of files by analyzing their file names. When you assign files to a drawing, the application reviews the file names to verify that they are being uploaded as a new version. You can easily identify the new version of a file by looking for a specific icon 

that appears on the uploaded file. Click 'Save' to save the plans as a new version.

Figure 12: Automatic versioning of plans

Method 2: Manual version upload

Newer versions can be directly uploaded by clicking on 'Upload new version' in the Plan view.

Figure 13: Manual version upload

How to move plans from one drawing to another?

Plans from a source drawing can be moved by assigning them to the destination drawing. To move, select the plans, and choose 'Assign' from actions.

Figure 14(a): Move plans

Then, select the destination drawing and click 'Assign' to move plans.

Figure 14(b): Move plans

How to filter tasks, forms, markups and comments on the plan view?

Click on the gear icon on the marker tool. Select/deselect the checkbox for tasks, forms, markups and comments

Figure 15: Plan view filters

How to add markups to the plan view?

The plan view supports multiple options in the marker tool to add markups to the plan. Choose from options such as drawing, shape or text. Based on your selection, add the markup on the plan view and annotate using the text and colour options.

Figure 16(a): Drawing options in the marker tool

Figure 16(b): Shape options in the marker tool

Figure 16(c): Include text using the marker tool

How to make measurements?

The marker tool allows for calibration and measurement in the plan view. Use the scale to calibrate and perform measurements with the marker tool's measurement option.

Figure 17(a): Measure options in the marker tool

1) The first step is to calibrate. Select calibrate under the measure option and choose the calibrate.

Figure 18(a): Calibrate

2) Once calibrated, choose between area or distance to measure

Figure 18(b): Measurements in plans

How to add a task, form and comment?

Click on the GPS icon in the marker tool to add a task or a form to the plan.

Figure 19(a): Attaching a task or a form to a plan

1) Select 'Create task' to add a task or 'Create form' to add a form to the plan.

Figure 19(b): Create task

Figure 19(c): Task details

3) Select the 'Comment' icon in the marker tool to add a comment to a plan.

Figure 20(a): Comment

To add a comment to a plan, select a comment from the marker tool and click anywhere on the map to place the comment.

Figure 20(b): Adding a comment to a plan

Was this article helpful?